Capacities

The main asset of the Company is the national power grid comprising as of 31 December 2019 of 374 overhead transmission lines of 0.4-1,150 kV totalling to 26,900.91 km (circuits) and 80 electric substations (SS) of 35-1,150 kV with transformer installed capacity of 38,246.05 MVA. They are used for cross-border electricity transmission, delivery of electricity from power plants and connection of the regional power companies with the major consumers.


Length of KEGOC’s transmission lines, as on 31 December 2019, km

Capacity and number of KEGOC’s
substations as on 31 december 2019

55 substations / 220 kV – 11,391.25 MVA
20 substations / 500 kV – 17,447.5 MVA
3 substations / 1,150 kV – 9,384.1 MVA
2 substations / 35 kV – 23.20 MVA


  • 80

    substations
    38,246.05 MVA